You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
My workflow generates 4-6 pictures/batch, then uses the Highres Fix Upscaler and afterwards the Non-AI "Upscaler1" and it seems the pictures are upscaled sequentially (CPU+GPU Load goes down a lot while upscaling while 1 CPU Core is at 100%), at least on the "Upscaler 1", is there a way of Multithreading this? I have a decent machine (3090, 16 cores, 128gb ram), and it should be able to handle more in parallel, at least 4 or 6 imho.
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
My workflow generates 4-6 pictures/batch, then uses the Highres Fix Upscaler and afterwards the Non-AI "Upscaler1" and it seems the pictures are upscaled sequentially (CPU+GPU Load goes down a lot while upscaling while 1 CPU Core is at 100%), at least on the "Upscaler 1", is there a way of Multithreading this? I have a decent machine (3090, 16 cores, 128gb ram), and it should be able to handle more in parallel, at least 4 or 6 imho.
Beta Was this translation helpful? Give feedback.
All reactions